Integrating the front-end with the database
The front-end developed in the earlier milestone will now be able to update the database. Other features like mail notification etc should be functional at this stage. In short, the system should be ready for integration testing.
12-13

Integration Testing
The system should be thoroughly tested by running all the test cases written for the system (from milestone 5).
14-15
Another 2 weeks should be the re to handle any issues found during testing of the system. After that, the final demo can be arranged.